Clarence Valley Extends Trial
After the success of the LBin trial Clarence Valley Council agreed to trial a SheltaBay System as part of the prototyping process. The bay was installed with the support of MI Organics. The location of the installation added effectively a 7th bay to the site.
Feedback from the operators was very positive and constructive. Specifically they highlighted the ease of managing problem waste and clients. Where a load was suspected to contain Asbestos or when a known problem user came on site they directed them to the CWT bay. This allowed them to thoroughly inspect each delivery.